Total external static pressure (TESP) is the supply reading plus the return reading, with the signs ignored. Measure the positive pressure where air leaves the equipment and the negative pressure where it enters, with the blower on the highest speed it runs. If the return reads -0.30 in. w.c. and the supply reads +0.25, the TESP is 0.55 in. w.c. Then compare that with the maximum rated external static pressure on the equipment's nameplate.
The number tells you whether the ducts, filter and coil are asking more of the blower than it was built for. It doesn't tell you which part is to blame. For that you take a few more readings, shown in the worked example below. Once you know which side is tight, put the airflow and size of any suspect run into the duct velocity calculator to see how fast the air is moving and how much friction that run adds.
What you need
A manometer that reads in inches of water column. A dual-port digital one that shows each port on its own makes this quicker, because you can see the supply and return at the same time and tell which side is high. A single-port meter works too; you just read each side separately and add them. You also need static pressure tips for the hoses and a 3/8 inch drill bit. On metal duct, use a bit with a stop so it can't go too deep.
Where to put the test ports
The rule is to measure outside whatever the manufacturer shipped as one unit. Anything inside the cabinet is already counted in the blower rating. Anything you added in the field, such as an add-on coil or a filter rack, is external and has to be inside your two readings.
| Equipment | Return port | Supply port | Counted as external |
|---|---|---|---|
| Gas furnace with an add-on coil | After the filter, before the furnace | Between the furnace and the coil | Coil, external filter, ducts |
| Two-piece air handler (separate coil section) | After the coil, just before the blower section | Supply plenum, a short way from the cabinet | Coil, filter, ducts |
| Air handler with the coil inside the cabinet | After the filter, before the air handler | Supply plenum, a short way from the cabinet | Filter, ducts |
| Package or rooftop unit | Where air enters the unit | Where air leaves the unit | Ducts only (factory filter and coil are part of the unit) |
Don't put the supply port right at the blower outlet. The air is turbulent there and the reading jumps around. Look before you drill so you don't hit a coil, a drain pan or a heat exchanger, and never drill near electric heat strips. If the heat strips sit in the supply path, look up their pressure drop in the manufacturer's engineering data and add it to your measured TESP.
How to take the readings
- Find the equipment nameplate and write down the maximum rated external static pressure. On a furnace it is usually inside the burner compartment. On an air handler or package unit it is often on the blower panel.
- Drill the two ports in the places shown in the table.
- Zero the manometer. An analog gauge needs to sit level before you zero it.
- Set the system so the blower runs on its highest speed, usually cooling, and give it about three minutes to settle.
- Put a static pressure tip in the return port with the tip facing into the airflow. Read and record it. Then do the same at the supply port.
- Add the two numbers and ignore the plus and minus signs. The signs only tell you which side you were on. With a dual-port meter, the supply hose goes on the + port and the return hose on the - port, and the display shows the total.
- Plug the ports when you are done.
Digital manometers drift a little after a few minutes, so zero again before each new reading.
Worked example: finding where the pressure goes
These are example readings, made up to show the method. Say a gas furnace with an add-on coil has a nameplate rating of 0.50 in. w.c. You measure -0.34 at the return port after the filter and +0.30 at the supply port between the furnace and the coil.
TESP = 0.34 + 0.30 = 0.64 in. w.c. That's 0.14 over the rating, or 28 percent. The blower is working against more resistance than it was rated for, so it is moving less air than its table shows at 0.50.
Now split it up. Take one more reading before the filter and one after the coil:
| Reading or part | Value | Share of the 0.50 rating |
|---|---|---|
| Return duct and grille (reading before the filter) | 0.14 | 28% |
| Filter (0.34 - 0.14) | 0.20 | 40% |
| Coil (0.30 - 0.08) | 0.22 | 44% |
| Supply ducts (reading after the coil) | 0.08 | 16% |
| Total external static pressure | 0.64 | 128% |
In this example the duct runs only use 0.22 between them. The filter and the coil use 0.42, which is most of the rating on their own. So the first things to look at are a dirty or restrictive filter and a dirty coil, not new ductwork. Had the return duct reading been the big one, a bigger return or another return grille would be the place to start.
What a high or low reading means
A TESP above the nameplate rating means the blower can't move the air it was rated to move. Fixed-speed and variable-speed blowers both suffer, and the airflow can drop below the 400 CFM per ton that many systems are set up around. Common causes are dirty filters, blocked or undersized ducts, closed dampers, kinked flex, a dirty add-on coil, or simply a blower set to more airflow than the ducts can carry.
A reading well under the rating isn't automatically good news. Leaky or disconnected ducts, a missing filter and a low fan speed all pull the number down. So does anything that cuts the blower's airflow from inside the cabinet, like a dirty blower wheel, a dirty coil inside the cabinet or a clogged factory filter. Those restrictions sit inside the box, so the TESP reading can't see them. It looks better than it should because less air is moving. Check the fan speed setting, and look at the blower wheel before you accept a low reading.
Turning the reading into airflow
The manufacturer's blower table lists the airflow at each speed tap across a range of external static pressures. Find the speed tap the blower is on, then read the CFM at your measured TESP. Some tables are rated with a filter or heat kit in place, so read the notes under the table and adjust for them.
Duct pressure rises with roughly the square of the airflow. Push 10 percent more air through the same system and expect about 21 percent more pressure (1.1 x 1.1 = 1.21). Cut the airflow by 20 percent and the pressure drops by about 36 percent (0.8 x 0.8 = 0.64). That's why turning the blower up rarely fixes a system that already reads high.
Calculating static pressure before the ducts go in
On a new design, you work it the other way. Start from the blower's rated external static pressure at the airflow you want, take away what the coil, filter, grilles and dampers use, and what is left is what the ducts can spend. The friction rate guide shows how to turn that into a friction rate for sizing, and the CFM per ton guide covers the airflow side. For the real design, ACCA Manual D and the manufacturer's data come first.
The readings in this article are examples only. Every system is different, so go by the nameplate, the manufacturer's installation instructions and local code. Turn off power before you open any panel.
Frequently asked questions
What is a good static pressure for a furnace?
Whatever is at or under the maximum rated external static pressure on its nameplate. A lot of residential equipment is rated at 0.50 in. w.c., but ratings run from about 0.30 to 1.0, so check the plate rather than assuming.
Where do you measure return static pressure?
Where the air enters the equipment, after the filter if the filter is outside the cabinet. On a two-piece air handler with a separate coil section, measure after the coil, just before the blower section.
Do you add or subtract static pressure readings?
Add them and ignore the signs. A return reading of -0.30 and a supply reading of +0.25 make a TESP of 0.55 in. w.c. The minus sign only means that side is under negative pressure.